Module 7: Whole-building loads and part load
7.4 Sizing and staging equipment for part load
A shopping centre manager, Dawit, has a complaint. The new air-conditioning plant was designed with a generous margin, because the engineer did not want to be blamed if the centre was ever too warm. Now the units on the shop floors start and stop every four…
In this lesson you will learn to
- Describe the ways of dividing a design load among one or several units, and the lowest stable load of each.
- Read the part-load efficiency curve of a fixed-speed and a variable-speed machine.
- Explain short cycling in a zone, and calculate how long a unit runs and how many times it starts in an hour.
- Show why an oversized unit can cost more in energy and give worse humidity control.
- Compare plant options for annual energy, cycling and redundancy, using the bin hours of the building.
- Say what must be carried from this module into the selection of the coil and the machine.