Skip to content

Module 6: Pressure testing, flushing and filling

6.1 Pressure testing of pipework

Study time 45 min Abdul Malick Nowshad Ahmed Enrolled students

In March, the third floor of the example building was handed to the tenant, and by June the tenant had moved in. The ceilings were painted, the carpets were down and a row of potted plants stood along the window. In the first week of July, a brown stain…

In this lesson you will learn to

  • Find the test pressure of a system from its working pressure and its height, and check that every component can bear it.
  • Explain why a test with water is safer than a test with air, using the stored energy of each.
  • Find the volume of water needed to raise a system to its test pressure, and the effect of air in the system.
  • Explain how a change of temperature changes the pressure, and judge a hold test that has been affected by it.
  • Estimate the size of a leak from the fall of pressure.

Enroll to continue

Create a free student account or log in to read the full lesson, track your progress and take the assessments.