Module 8: Standby power and UPS
8.4 Load bank testing
The load bank arrived on a Wednesday in March, on the back of a flat truck, and the whole building came to the windows to look at it. It was a long grey box on a trailer, the length of a bus and the height of a man, with louvres along its sides, two largeā¦
In this lesson you will learn to
- Explain why a standby generator is proved by a load bank test, and what a load bank is.
- Work out the number of load bank steps needed for a test at a given percentage of the rating.
- Judge the voltage and frequency readings at each step against acceptance limits.
- Estimate the fuel and cost of a load bank test.
- Decide whether a yearly test is worth its cost.
Enroll to continue
Create a free student account or log in to read the full lesson, track your progress and take the assessments.
