Module 6: Transformers and substations
6.4 Utility connection and metering
The letter from the electricity company arrived on a Tuesday, and Amara read it twice. It was a formal offer of connection for the office, from Mr. Hakimi, the engineer who handled new connections for the area, and it was short. The company would supply theā¦
In this lesson you will learn to
- Find the primary current of a transformer and choose the high-voltage fuse by the usual rule.
- Choose the agreed capacity of a supply by comparing the yearly cost at several values.
- Choose the tap of a transformer so that the voltage in the building stays inside its window.
- Check that the high-voltage fuse is slower than the low-voltage main breaker.
- Compare high-voltage and low-voltage metering by the cost of the losses and of the equipment.