Module 10: Capstone: the power distribution design of a building
10.3 Standby, power quality and metering
Dr. Halvorsen was the planning engineer at the utility, and he came to the site with three letters and no hurry. He had a quiet manner and the habit of asking a question as if he were thinking aloud, which made people answer him more honestly than they…
In this lesson you will learn to
- Size one standby generator for the whole campus from the essential loads of every block, with the growth allowance, and choose its rating from the engine kW.
- Find the capacitors that bring the power factor to a target, and the saving in kVA and in capacity charge that they give.
- Find the rms current of the non-linear loads of a building, add them for the worst case, and find the neutral current that the third harmonic produces.
- Plan the sub-metering of a building, check the sum of the sub-meters against the main meter, and allocate cost to the end uses.
- Calculate the load steps and the fuel of the chosen generator, and say what the standby plant must prove before it is accepted.
Enroll to continue
Create a free student account or log in to read the full lesson, track your progress and take the assessments.
